Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>power station gas steam boiler deal
power station gas steam boiler dealer
When gas boiler outage, we should not panic, there must be the order of the operation, shut off the gas boiler. 1, the normal shutdown sequence, check the gas fired boiler fuel, gas, water shutdown valve meets the requirements; 2, off gas, coal boiler blowdown valve to prevent the surface of boiler drum cause other problems; 3, quickly closing the main steam valve prevent dehydration gas fired
Get A Quote