Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>DZL Coal-fired/biomass Steam Boiler-Biomass/coal Ste
DZL Coal-fired/biomass Steam Boiler-Biomass/coal Steam
1.The boiler adopts the latest research results,such as:arched tube plate,screw thread smoke tube,hot water boiler backwater ejection technology,solves the pot type boiler tube plate crack at the lower part of the drum,drum kits,water wall tube broken ,low thermal efficiency,low output,poor adaptability of coal.2.Combustion:fuel from coal scuttle fall in front of the stove grate,during
Get A Quote
>Tarm Biomass, wood boiler, pellet boiler. biomass suppli
Tarm Biomass, wood boiler, pellet boiler. biomass supplies
Tarm Biomass sells wood boilers, pellet boilers, wood chip boilers, thermal storage tank, heating supplies, mixing valves, Termovar valves, actuators, mixing valve controllers, HS Tarm parts, and LK Armatur products for solid fuel boiler installations.
Get A Quote