Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>3 ton water boiler | ZOZEN Boil
3 ton water boiler | ZOZEN Boiler
3 ton gas fired boiler exported to Indonesia, WN. 2019-4-8 · Overview. Product introduction:WNS3-1.0-Q is 3 ton WNS gas boiler,the boiler burns natural gas as fuel,which greatly reduces the polluting gas emissions,at the same time,the boiler adopts the international popular three return structure, advanced waveform furnace structure,threaded pipe structure,wet back structure,has multiple
Get A Quote