Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>Cornel Ilie a devenit tată pentru a doua oară: pri
Cornel Ilie a devenit tată pentru a doua oară: prima
Solistul trupei Vunk, Cornel Ilie (42 de ani), a devenit tată pentru a doua oară şi a postat, în mediul online, prima imagine cu bebeluşul, dar şi un mesaj emoţionant, în care spune că „mămicile sunt Dumnezei, tăticii sunt doar simpli oameni“. Eliza Ilie (31 de ani), cea care i-a devenit soţie acum patru ani, i …
Get A Quote